• New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap
  • New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap
  • New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap
  • New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap
  • New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap
  • New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap

New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap

Shaping Mode: Injection Mould
Surface Finish Process: Mirror Polishing
Mould Cavity: Multi Cavity
Plastic Material: Plastic,Customized
Process Combination Type: Customized
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware
Customization:
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Shanghai, China
to see all verified strength labels (19)

Basic Info.

Model NO.
A0262
Runner
Hot/Cold Runner
Design Software
Ug/PRO-E/Auto CAD
Installation
Customized
Certification
ISO
Standard
HASCO
Customized
Customized
Transport Package
in Standard Wooden Case
Specification
Customized
Trademark
MY Mould
Origin
Shanghai, China
Production Capacity
2000, 000/Month

Product Description

                New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap

1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to  be before mold making. 
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.

Mould material

Plastic mould material: P20 steel, 718, 2738,H13, NAK80,1.2344,2343,S136,etc....

Fast mould design

We can be within 1-3 working days after getting customer's drawings.

Lead time

Plastic moulds: 2- 7 weeks after getting the mould design confirmation.

Mould testing

All of the moulds can be well tested before the shipments. Videos testing the moulds are available.

Minimum order

Small orders can be accepted.

Production capacity

45-50 sets/month.

Port

Shanghai

Runner

YUDO runner, hot Runner, cold runner, sub gate/edge gate /cow horn gate…etc

Payment terms

L/C T/T Western Union MoneyGram.

Mould making service

OEM/ODM service is available.

After-sales service

Life-long gurantee.

Safe packing

In strong wooden pallets to avoid any damages during long transportation.

 

New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap

New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap

New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap

New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap

New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap

 

New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap

          New PE Material 20 Liter Water Bottle Cap/Water Dispenser Cap
 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
55
Year of Establishment
2009-08-03