Customization: | Available |
---|---|
Shaping Mode: | Injection Mould |
Surface Finish Process: | Mirror Polishing |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Mould material |
100~300k, Mould Material(Soft Mould):P20,718,2738...... |
Specific feed/gate locations | |
Surface finish | Commercial polishing (General Polishing) Highly polish (Mirror Polish) Matte Finish (EDM Treatment) |
3D/2D drawings | STP/ STEP, IGS/ IGES, x_t, CAD |
Fast mould design |
We can be within 1-3 working days after getting customer's drawings. |
Lead time |
35 - 45 days after getting the mould design confirmation. |
Mould testing |
All of the moulds can be well tested before the shipments. Videos testing the moulds are available. |
Minimum order |
Small orders can be accepted. |
Production capacity |
45-50 sets/month. |
Port |
Shanghai |
Runner |
YUDO runner, hot Runner, cold runner ... ... |
Payment terms |
L/C T/T Western Union MoneyGram. |
Mould making service |
OEM/ODM service is available. |
After-sales service |
Life-long gurantee, Comes with free mold parts. |
Safe packing |
In strong wooden pallets to avoid any damages during long transportation. |
We have been engaged in this field for 15 years, we've served customers from the United States, the United Kingdom, Spain, Australia, Singapore, Russia and other countries. |
Professional Certification |
Quality control and technology improvement |
•ISOIS09001:2000 |
•SGS certificate |
•The complete quality control system. |
Precision durable mold |
•3 CNC: Precision 0.005mm |
•1 Three dimension:1Precision 0.001mm |
•1 wire drive slowly: Precision 0.002mm |
•2 Mirror discharge: Precision 0.005mm |
100% Guaranteed Quality |
•100% tested(Not Just Batch Tested) |
•SOP standard production |
•IQC(tested all in matical )-IPQC(tested first parts and prodcut)-FQC(tested finished parts)-OQC(Shipments) |
•10 professional quality control inspectors |
Competitive price and service |
•Delivery time: 2-3 Weeks after order |
•Provide new design for customers' requirements |
•Provide DFM Report,Moldflow,Mould Design,MPR,QC Report, Injection parameter sheet,Testing video. |
•Free provided sample. |
•10-20% cheaper than other competitors |
•Return the entire mould cost if you order 500,000pcs product. |
•Life-long guarantee period, which is much longer among this field. |