PP /ABS /PC Plastic Injection Moulding

Product Details
Customization: Available
Shaping Mode: Injection Mould
Surface Finish Process: Polishing
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (19)
PP /ABS /PC Plastic Injection Moulding pictures & photos
  • PP /ABS /PC Plastic Injection Moulding pictures & photos
  • PP /ABS /PC Plastic Injection Moulding
  • PP /ABS /PC Plastic Injection Moulding
  • PP /ABS /PC Plastic Injection Moulding
  • PP /ABS /PC Plastic Injection Moulding
  • PP /ABS /PC Plastic Injection Moulding
  • PP /ABS /PC Plastic Injection Moulding
Find Similar Products

Basic Info.

Model NO.
A0023
Mould Cavity
Multi Cavity
Plastic Material
ABS
Process Combination Type
Single-Process Mode
Application
Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware
Runner
Cold Runner
Design Software
UG
Installation
Fixed
Certification
TS16949, ISO
Standard
HASCO
Customized
Customized
Gate Type
Yudo Runner, Hot Runner, Cold Runner, Sub Gate,Edg
Mold Steel
P20,718,2738h,Nak80,H13,8407,1.2344
Heat Treatment of Steel
HRC48-52
Our Service
Dfm Report,Mould Flow,Mould Design,Mpr,QC Report.
Cycle Time
15-60s
Packaging Details
Wooden Case for Moulds, Cartons for Parts , or as
Transport Package
Cases
Specification
30X40X30cm
Trademark
MY MOULD
Origin
Shang Hai
HS Code
8480300000
Production Capacity
450 Sets/Year

Product Description

                     PP /ABS /PC Plastic Injection Moulding
1-Start from part design analysis.
2-Mold design drawing and DFM report available so you can see how is the mold going to be before mold making. 
3-If product is complex,moldflow report will be present as well.
4-In house mold making shop ensure you mold quality under well control.
5-Normally it takes 20-40 days to make mold,precise time depends on part design.

Mould material

Plastic mould material: P20 steel, 718, 2738,H13, NAK80,2344,2343,S136,etc....

Fast mould design

can be within 1-3 working days after getting customer's drawings.

Lead time

Plastic moulds :3- 6 weeks after getting the mould design confirmation.

Mould testing

All of the moulds can be well tested before the shipments. Videos for testing the moulds are available.

Minimum order:

small orders can be accepted.

Production capacity

50 sets/month

Port

shanghai

Runner

Hot/cold

Payment terms

L/C T/T Western Union Money Gram.

Mould making service

OEM/ODM service available.

After sales service

Available by our staff with more than 10 years of working experience in this field.

Good packages

In strong wooden pallets to avoid any damages during the long transportation.

Workshop

PP /ABS /PC Plastic Injection Moulding
                                                       Why customer choose us?
 
We have been engaged in plastic mold and plastic products export services, we have been engaged in this service for 15 years, we serve the United States, the United Kingdom, Spain, Australia, Singapore, Russia and other countries.
Professional Certification
Quality control and Technology improvement
•ISOIS09001:2000
•SGS certificate
•Has the complete control project system.
Precision durable mold
•3 CNC :  Precision 0.005mm
•1 Three dimension: 1Precision 0.001mm 
•1 wire drive slowly:  Precision 0.002mm
•2 Mirror discharge:  Precision 0.005mm
100% Guarantee Qualtiy
•100% tested(Not Just Batch Tested)
•SOP standard production
•IQC(tested all in matical )-IPQC(tested first parts and prodcut)-FQC(tested finished parts)-OQC(Shipments) 
•10 quality control people
Competitive Price And Service
•Delivery Time:2-3 Weeks After Orders
•Provide New Design For Customer Requirements
•Provide DFM Report,Moldflow,Mould Design,MPR,QC Report, Injection parameter sheet,Testing video.
•Free provide sample.
•Price cheap 10-20% than other same indursry
•Can rerurn all mould cost  if order  50,0000pcs  product.
•Maintenance and maintenance mould is in lifetime. other same indursry is only 3 months.
  1. Manufacturing and exporting experience for over 10 years. ISO 9001 approved &TS16949 approved .

  2. Products are supplied to over 50 countries.

  3. One-stop service for aluminum profiles, plastic parts, rubber parts, and moulds. Save time and save money for you.

  4. In-house mold design and building capabilities.

  5. No reclaimed material used to ensure high quality.  

  6. Keep secret to your idea and your design.

  7. 24 hours (two shifts) / 6 days for production.

  8. Professional design team, mold maker engineer. OEM/ODM service.

  9. Professional QC and R&D teams to assure high quality.

  10. Professional sales team. Good English capabilities and communication skills.

  11. No MOQ.

  12. Prompt delivery. For prototype: 3-7 days. Production orders can be arranged specially to meet customer's urgent demands.

  13. Geographical advantages: within 30 minutes to airport or sea port.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier