• Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
  • Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
  • Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
  • Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
  • Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
  • Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts

Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts

Shaping Mode: Punch Die
Surface Finish Process: Mirror Polishing
Mould Cavity: Multi Cavity
Plastic Material: Customized
Process Combination Type: Customized
Application: Car, Household Appliances, Furniture, Commodity, Electronic, Home Use, Hardware, Food, Packing, Archetecture
Samples:
US$ 1/Set 1 Set(Min.Order)
| Request Sample
Customization:

Contact Supplier

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
w249
Runner
Customized
Design Software
UG
Installation
Fixed
Certification
TS16949, ISO, FDA
Standard
HASCO
Customized
Customized
Gate Type
Valve Gate/Open Gate/Sub Gate/Edge Gate
Mold Steel
P20,Nak80,SKD61,1.2344,H13
Cycle Time
15-60s
Production Material
as Per Clients′ Requirements
Shape
Based on Drawings
Free Services
Dfm Report,Mould Flow,Mould Design,Mpr,QC Report,
Our Services
Prototyping Andsecondary Operations
Impression
Single Cavity or Multi Cavity
Transport Package
Carton
Specification
Customized
Trademark
MY Mould
Origin
Shanghai, China
HS Code
8480719090
Production Capacity
2000, 000/Month

Product Description

Precise High Quality Dayton Carbide Punch Die/Stamping dies


1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to  be before mold making. 
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes 15-60 days to make mold, precise time depends on complexity of design.

Mould material

Plastic mould material: P20 steel, 718, 2738,H13, NAK80,1.2344,2343,S136,etc....

Fast mould design

We can be within 1-3 working days after getting customer's drawings.

Lead time

Plastic moulds: 2- 7 weeks after getting the mould design confirmation.

Mould testing

All of the moulds can be well tested before the shipments. Videos testing the moulds are available.

Minimum order

Small orders can be accepted.

Production capacity

45-50 sets/month.

Port

Shanghai

Runner

YUDO runner, hot Runner, cold runner, sub gate/edge gate /cow horn gate…etc

Payment terms

L/C T/T Western Union MoneyGram.

Mould making service

OEM/ODM service is available.

After-sales service

Life-long gurantee.

Safe packing

In strong wooden pallets to avoid any damages during long transportation.

Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
 
Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts
          Customer Made Punch Die/ Stamping Dies for Hardware/Stainless Steel/Auto Parts

Send your message to this supplier

*From:
*To:
avatar Miss Daly Liu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Contact Supplier

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Number of Employees
55
Year of Establishment
2009-08-03